Turn key supply of gypsum board manufacturing plant to BRAZIL 2009-2010

Thai Team.
Thai Team.

Turn key supply of gypsum board manufacturing plant to BRAZIL 2009-2010
Trevo Drywall

TREVO DRYWALL

Turn key gypsum wall board plant in Brazil
Year 2009 we supply turnkey project gypsum wall board plant capacity 6 Mil.sq.mm./year to Trevo Drywall in Brazil.

BRAZIL 2009-2010
Overall plant layout with 3D drawing.

 

Visit our pilot plant in Thailand (capacity 1 Mil.sq.mm./year).
Visit our pilot plant in Thailand (capacity 1 Mil.sq.mm./year).
Sign contract on January 28, 2009.
Sign contract on January 28, 2009.
Most of machine was assembly and functional test before final painting and packing.
Most of machine was assembly and functional test before final painting and packing.
Forming belt, test alignment and surface treatment before packing.
Forming belt, test alignment and surface treatment before packing.
Mr. Inaldo visit Dryer blower shop.
Mr. Inaldo visit Dryer blower shop.
Mr. Inaldo visit Dryer blower shop.
Mr. Inaldo visit Dryer blower shop.

 

Mr. Inaldo inspection and test air flow for Dryer blower before shipping to Brazil.
Mr. Inaldo inspection and test air flow for Dryer blower before shipping to Brazil.
Dryer blow Box.
Dryer blow Box.
Dry additive feeder with tank agitator (Good Flow).
Dry additive feeder with tank agitator (Good Flow).
Pin Mixer (World class designed).
Pin Mixer (World class designed).
Mixer and Dryer electrical panel (All Equipments we use world class brand name).
Mixer and Dryer electrical panel (All Equipments we use world class brand name).
Panel packing with bubble protection and vacuum air seal.
Panel packing with bubble protection and vacuum air seal.
Blower packing and shipping.
Blower packing and shipping.
We supersive and Fine-tune installation in Brazil.
We supersive and Fine-tune installation in Brazil.
Mixer area.
Mixer area.
Automatic paper guide.
Automatic paper guide.
Inlet area with inverter arms.
Inlet area with inverter arms.
Wet additive mixing tank and using tank with level sensor tube.
Wet additive mixing tank and using tank with level sensor tube.
Forming belt after final surface treatment.
Forming belt after final surface treatment.
Damper for Dryer blow box
Damper for Dryer blow box
We run the plant and training customer operator.
We run the plant and training customer operator.
Wet test with first board.
Wet test with first board.
Test peeling quality at Dryer out let by Brazil plant manage.
Test peeling quality at Dryer out let by Brazil plant manage.
With Trevo operator team.
With Trevo operator team.
With Mr. Beto Alencar (Trevo CEO)
With Mr. Beto Alencar (Trevo CEO)
Thai Team.
Thai Team.